JULIE Locates
What is JULIE?
JULIE stands for Joint Utility Locating Information for Excavators. They are a non-for-profit corporation dedicated to keeping Illinois safe and connected. Too frequently an underground utility is damaged or someone is hurt because somebody decided to dig without having companies mark and flag. JULIE is a free one-call center service. They do not dig or own any underground utilities. Companies and the village will mark their own underground utilities once a JULIE request is made.
JULIE’s toll-free number – 1-800-892-0123 – is also available to call for a locate request. Both 8-1-1 and 1-800-892-0123 are staffed by JULIE Call Center agents 24 hours a day/7 days a week.
Call at least 2 business days before you plan to dig and a helpful call center agent will assist you with your locate request. Both the call and services are free. You may also submit a JULIE request online by visiting the JULIE website or clicking the e-request below.
You will be given a reverence number, called a JULIE Dig Number. Utility companies and the village should have their underground lines marked sometime between your confirmation and the dig start date and time. A locator from each utility company will either mark the location of their facilities with paint and/or flags or tell you that their lines are not in conflict with the area in which you are digging.
Note: Utility locators should always have clearly visible identification and rarely need to enter your home to complete a locate request.
When Can I Start My Project?
Even if all the underground utility lines have been located and marked, you must not begin until the start date and time you indicated on your JULIE ticket. State law requires your digging project to begin within 14 days of being issued your JULIE Dig Number. If at any time during the excavation the markings are no longer visible, you are required to call JULIE and request that the markings be refreshed.
Respect the Marks
Careful excavation should be performed only after confirming that all utility companies and the village have marked the location of their underground lines or notified you that they have no buried lines in the area. If any of the member utilities listed on your locate request ticket have not responded or, if it is clear that an underground utility line has not been marked, call JULIE at 811 or 800-892-0123. Call center agents are available 24/7/365.
For residents that see flags in their parkway, it’s important to leave the lines and flags alone for at least two weeks. Some contractors are performing large jobs, therefore there may be many lines and flags along several parkways in your neighborhood. Please be respectful of the flags and leave them in their place. Once work is complete, the contractors will remove the flags.
Locating an underground utility line is not an exact science. The marks indicate the approximate location of a buried line. If possible, dig outside the tolerance zone, which is 1.5 feet on either side of the mark. If you must excavate within the tolerance zone, dig next to the marks, not on top of them. Hand dig with extreme caution if you must excavate within the tolerance zone.
JULIE member companies use the following color code when paint or flags are utilized to mark their underground facilities:
A locator from a utility company or the village will only mark the underground facilities that they operate and/or maintain. They do not locate private underground lines which are lines installed after the operator or their contractor have installed the basic service. These lines are considered customer-owned or private lines.
Examples of private lines may include:
- Natural gas or underground piping to a garage or an out building
- Propane lines
- Lines to gas grills and pool heaters
- Private water systems
- Septic systems
- Drain lines from downspouts
- Underground sprinkler systems
- Electric lines installed after the meter
- Invisible pet fences
- Data communications lines
Water companies or the village locate their main lines in easements and rights-of-way and lines to the b-box. However, they may not locate the water lines from the b-box to a home or building. Sewer companies or the village locate their main lines but may not locate any portion of a lateral service to a home or building. Check with your local service companies or the village to determine their locate requirements.
Electric companies usually locate their lines to the meter at residential properties, but not those running to swimming pool pumps and heaters, irrigation systems or other buildings on the property. Commercial property owners should check with their electric company to determine if any or all of the electric lines will be located by the utility.
Private lines will be part of almost every job. Take time to survey the work site for signs of private lines:
- Is there a propane storage tank on the property?
- Is there a detached garage or outbuilding with lighting?
- Is there a pool heater or gas grill? or
- Did you notice an underground sprinkler system?
Take a few moments to review these issues with the property owner prior to beginning your excavation, but keep in mind that previous property owners may have installed lines that the current owners don’t know about.
Do not dig until the buried lines are identified and marked. JULIE member companies DO NOT locate privately installed lines. These lines can be located by hiring a private locator.
The tolerance zone is a pre-defined horizontal distance extending from the outer edge of a line or pipe that runs underground. The exact distance that define this tolerance zone is 18″ on either side of the line or pipe (utility) plus the diameter of the line or pipe itself.
The tolerance zone acts as a warning to an excavator that they need to proceed with caution while working in this area.
Excavators should hand dig, pot hole or vacuum excavate within the tolerance zone.
Do I really have to notify JULIE for every project?
Yes. Illinois state law requires that anyone planning an outdoor project that requires digging, regardless of the depth or the size of the project, must notify JULIE at least two business days before putting a shovel in the ground. Even if you have notified JULIE for a previous project in the same area, you must notify JULIE again (every project, every time). It’s a free service.
Keep yourself, your family and your community safe. Homeowners often make risky assumptions about whether or not they should get their utility lines marked, but every digging job requires a call – even “small” projects like planting trees and shrubs. Learn more about the process and common examples of DIY projects which require notification.
How do I notify JULIE for a locate request?
Simply call 8-1-1 or 800-892-0123 or choose one of our self-service, online options such as E-Request anytime.
What information do I need before notifying JULIE?
Locate Request Checklist:
- Your name, address, and a phone number at which you can be reached. An email address and a fax number, if available
- The location where the excavation will take place, including county, city or unincorporated township, section and quarter section numbers if available, address, cross street (within 1/4 mile), subdivision name, etc.
- Start date and time of planned excavation
- Type and extent of excavation involved
- Whether the dig area has been outlined with white paint, flags or stakes
How much does it cost to use JULIE?
There is no cost. The notification to JULIE and the locating services provided by our utility members are free to homeowners and professional excavators. JULIE personnel do not own or locate and mark any underground lines.
When is JULIE’s Call Center open to receive and process locate requests?
We are always open. Call center agents and self-service online options are available to receive and process locate requests 24 hours a day, 365 days per year.
Who marks the underground utility lines?
Member utility companies (NOT JULIE) mark their own lines. JULIE functions as a communications link between our member utility owners/operators and individuals planning to dig on their property or work site. We notify our members who are operating utility lines in the proposed digging area once we have received a locate request. Keep in mind that companies often hire locating services to mark the lines for them.
Is JULIE a utility company or government agency?
Based in Joliet, JULIE is a non-for-profit corporation dedicated to keeping Illinois safe and connected. Our organization’s mission is to prevent damages to underground utilities, the environment and property, reduce service interruptions and costly repairs, and save lives. As an important reminder about our role in the process, JULIE does not own, locate and mark any underground utility lines. Learn more about JULIE history.
Will JULIE’s Call Center Agents tell me the specific location or depth of the public utilities?
No. Our call center agents do not have information on the specific location or depth of underground lines.
What do the colors of the flags and markings mean?
JULIE member utility companies use the American Public Works Association (APWA) color code to place marks or flags on the ground to correspond to their utility type. Learn what type of utility each color represents.
Can I dig after the 2 business day advance notice?
State law requires an excavator exercise due care at all times to protect underground utility lines. After waiting the required 2 business days, if the excavator observes clear evidence that there is an unmarked utility line in the area of the proposed excavation, the excavator should not begin excavating until two (2) hours after an additional call is made to the Statewide One-Call Notice System (JULIE) for the area. Learn more about what happens after the call.
Should I pre-mark the work site?
Yes. State law requires excavators to pre-mark the dig site when practical. If the excavation site cannot be clearly and adequately identified through the locate request, JULIE recommends that the excavator designate the route or area to be excavated using white paint, flags, stakes or a combination of these methods prior to contacting JULIE. Black may be used when snow is on the ground. Learn more about pre-marking here.
If I am the subcontractor on a job, do I have to get a locate request ticket or will the general contractor’s ticket protect me?
According to state law, the person doing the digging is required to notify JULIE with the locate request information at least two business days in advance of the start of the excavation, not the homeowner or company for whom the work is being done. The general contractor’s locate request only applies to its company. The general contractor should only request a locate if the general contractor itself is planning to dig at the site.
What are the excavator’s responsibilities while digging?
The excavator has an obligation to honor all time and marking requirements and then to dig in a reasonable and prudent manner, taking all reasonable and required precautions to avoid damaging underground lines. Always do a visual observation before digging. The law requires extra precaution, such as hand digging and/or vacuum excavation within 18 inches on either side of a marked underground line. Learn more about the tolerance zone.
What do you do if markings are no longer visible?
If facility markings are becoming or have become indistinguishable due to factors such as weather, fading, construction traffic or vandalism, you can request that facility markings be refreshed by the utility owners. Refresh Marks requests can only be submitted for excavation projects that were started within 14 calendar days of the initial locate requests. Refresh Marks requests may be submitted via our online, self-service option know as REV or by calling 8-1-1 or 800-892-0123.
What happens if damage occurs to a utility line while I am digging?
First, if you have created a potentially dangerous situation (i.e., damaged gas line, etc.), evacuate the area and immediately call 911 and/or the proper emergency responders. State law requires the excavator to call both JULIE and the owner of the damaged utility line. Learn more about damaged lines.
How long do I have to wait after calling in an emergency locate request?
An emergency locate request is processed immediately by the JULIE system. According to state law, excavators must wait at least two hours (or until the date and time requested on the notice, whichever is longer) before digging. If an earlier start time is needed, the excavator must demonstrate that site conditions warrant the earlier start time. If a member(s) does not respond within the required wait time, call the member company directly and/or JULIE again. JULIE will send another request to the member(s) not responding.
Are all underground line owners members of JULIE?
While all underground line owners and operators (except for the Illinois Department of Transportation, the Illinois Toll Authority and railroads) are required by state law to be members of JULIE, there may be some owners and operators who are not current members. Non-members can be reported to the Illinois Commerce Commission at 217-558-4010 (see Law & Enforcement).
What about Private Lines?
Operators of underground lines only locate the buried lines that they own, operate and/or maintain. They DO NOT locate private underground lines which are lines installed after the operator or their contractor have installed the basic service. These lines are considered customer-owned or private lines, and it is the owner’s responsibility to cover the cost to protect private underground utilities. Examples of private lines include, but may not be limited to: sewer lines, private lighting, sprinklers, fire mains, secondary electric lines to detached garages, pools, and septic lines. Learn more about Private Lines.
Where can I find more information about the state law and enforcement process?
To view the state law and learn about the enforcement process, click here. If you need more information or have any questions about the one-call process, please contact a Damage Prevention Manager.