Please use the link HERE to access the Village's Community Information page covering immigration enforcement actions in the community. An FAQ section, community resources, and a statement from Mayor Hoefert is found on this page.
The Village passed an ordinance on October 7th, 2025, providing guidance and regulation over the usage of e-bikes, low-speed e-scooters, and e-motos, following increased popularity of these devices. Visit the E-Bikes, E-Scooters, and E-Motos tab under the Police Departments section of the Village website for more information on these changes and access to the Downtown Mount Prospect "Walk Your Wheels" Zones map in Downtown Mount Prospect.
A link to that section of the website can be found HERE.
The Village of Mount Prospect implemented a local ordinance, which went into effect July 25, 2025, banning the sale of certain unregulated and potentially harmful substances, including hemp-derived synthetic THC products (such as Delta-8, Delta-10, and THC-O), kratom, and tianeptine. These substances are prohibited due to significant health concerns, their appeal to youth, and their lack of oversight under the state-regulated cannabis framework.
Although the ban took effect on July 25, a 90-day phase-out period allows for temporary sales to individuals aged 21 and over, with all sales required to end by October 23, 2025.
Ordinance No. 6795 was approved at the July 15, 2025, Village Board meeting. Read the ordinance here.
Contact the Community Development Department at 847-818-5328 for more information about this ordinance.
The Village of Mount Prospect published a new "Prestige Feed" page on the website's Transparency Portal to keep residents informed. This page provides a complete history of litigation surrounding the property and will be used to post future updates.
Flock LPR Cameras
The Village of Mount Prospect is aware of the comments by the State of Illinois concerning the use of Flock LPR Cameras. Misuse of these cameras by outside agencies is not supported by the Village. Please use the following link to access the press release published by the Village on June 12 and the extended transparency page with additional information.
The Village’s Comprehensive Plan and Bicycle Plan both identify opportunities for better connections between parks, schools, destinations, and neighboring communities for pedestrians and bicyclists. Safe crossing between Meadows Park and Melas Park is one challenge that has been recognized in promoting walking and biking. The two parks are divided by Northwest Highway (US Route 14) and the Union Pacific Railroad tracks. The Village believes constructing a pedestrian bridge over the roadway and railroad tracks in order to accomplish this key transportation goal would be effective.
Both Meadows and Melas parks are unique and draw residents from all areas of town. Melas Park is co-operated by the Mt. Prospect Park District and the Arlington Heights Park District. The Metropolitan Water Reclamation District of Greater Chicago (MWRD) owns the park. Melas Park facilities include a visual arts center, soccer fields, baseball/softball diamonds, a dog park, and walking paths. Meadows Park is owned by the Mt. Prospect Park District and includes an aquatic center, playground, and baseball/softball diamonds. The proposed pedestrian bridge will be constructed at the northeast corner of Melas Park and the southwest corner of Meadows Park.
The property at 310 W. Northwest Highway had automotive repair and filling station operations dating back to the 1930s. Staff sought approval of the Village Board to acquire the property to create a downtown gateway. This property was a strategic opportunity for the Village to create a welcoming gateway and green space in an area that is significantly built out.
Learn more about Central Gateway at 310 W. Northwest Highway.
In December 13, 2022 Committee of the Whole meeting, Tricia Dupilka and Kate Webster from inQUEST presented their findings that identify opportunities for improvement in the Village's current internal practices/policies. inQUEST will also provided recommendations for the Village to make progress on its diversity, equity and inclusion journey including a community survey. View inQUEST's Report to the board. View inQUEST's presentation to the board.
Quarterly updates are posted on the Diversity, Equity, and Inclusion main page.
The Elk Grove Rural Fire Protection District no longer provides fire and EMS protection services. In order to ensure these unincorporated properties continue to receive life-safety services; the District ceased operation abruptly on October 1, 2023. Due to a change in participation with the parties included in the Special Service Area adopted by Village Ordinance #6619 on August 16, 2022, the Village of Mount Prospect proposed a new SSA be established to provide Fire and EMS services to unincorporated areas included in the Elk Grove Township Rural Fire District. The proposed SSA area now covers the entire unincorporated areas under one map, instead of being broken into three separate SSA areas.
January 10, 2024 Update: The Village Board held a Public Hearing for the proposed Special Service Area on November 7, 2023. The ordinance adopting the Special Service Area was approved at the January 9, 2024 Village Board Meeting.
June 18, 2024 Update: The Village has assumed responsibility for the Elk Grove rural Fire Protection District and annexed the properties.
Learn more about several downtown development projects, located within the Prospect & Main TIF District on the Downtown Development Projects page. This page includes the project status updates as well as TIF metrics for each development.
The Village adopted a Tax Increment Financing District on the Village's south side on May 3, 2022. Learn more about the project, access TIF-related documents and dates for public meetings, or register to be included on the Interested Parties list on the South Mount Prospect TIF page.
Overview of Village Government Structure
The Village operates as a Council - Manager form of government. View the Village's current Board of Trustees.
Upcoming Village Board, various Commission and Committee meeting dates are found on the Meeting Calendar.
Agendas for upcoming Village Board, Committee of the Whole, and Planning and Zoning Commission meetings are available on the Meetings and Agendas page. You can also find previous meeting packets and minutes on this page.
Find contact information for Village Administration at their department page.
Information on the Village finances, including annual reports, are found on the Finance Department page. Finance also has information on various taxes, including rates and distribution.
The Village's Human Resources Department has Village Compensation and Collective Bargaining Agreements available online.
Strategic Plan Progress and Dashboards
The Village has launched public dashboards which allows anyone to see the status of specific items within the Village's Strategic Plans. As of January 2024, the Village has wrapped updates on the plans below, and continues to work on items within the 2023-2024 Plan; the 2023-2024 plan dashboard is now live.
- 2023 - 2024 Strategic Plan Dashboard
- 2022 - 2023 Strategic Plan Dashboard
- 2021 - 2022 Strategic Plan Dashboard
To view the current Strategic Plan, as well as past plans, visit the Strategic Plan Progress and Dashboards webpage.
Freedom of Information Act (FOIA)
To request public records from the Village, please use the Village's CRM portal. Choose the appropriate FOIA category, fill out the fields completely and submit. It will be routed to the Freedom of Information Act (FOIA) Officer.
Annual Report
Click image/button below to read the 2025 annual report. The report includes highlights, accomplishments, and data from the previous year.
This document is interactive and includes features such as clickable links, a clickable table of contents, and functions to zoom in closer to charts, tables, and other small details with one click.
Download the PDFMelas-Meadows Pedestrian Bridge
If you would like to receive email notifications regarding this project, please select this option and include your email address in the body of the email.
The Village of Mount Prospect’s Comprehensive Plan and Bicycle Plan both identify opportunities for better connections between parks, schools, destinations, and neighboring communities for pedestrians and bicyclists. One challenge that has been recognized to promote walking and biking is to provide a safe crossing between Meadows Park and Melas Park. The two parks are divided by Northwest Highway (US Route 14) and the Union Pacific Railroad tracks. The Village desires to construct a pedestrian bridge over the roadway and railroad tracks to accomplish a key transportation goal.
Both parks are unique and draw residents from all areas of town. The Mount Prospect Park District and the Arlington Heights Park District co-operate Melas Park. It is owned by the Metropolitan Water Reclamation District of Greater Chicago (MWRD). Melas Park facilities include a Visual Arts Center, soccer fields, baseball/softball diamonds, a dog park, and walking paths. Meadows Park is owned by the Mount Prospect Park District and includes an aquatic center, playground, and baseball/softball diamonds. The proposed pedestrian bridge will be constructed at the northeast corner of Melas Park and the southwest corner of Meadows Park. Partners in this project include the Village of Mount Prospect, Mount Prospect Park District, Village of Arlington Heights, Arlington Heights Park District, School District 57, School District 214, Illinois Department of Transportation, Union Pacific Railroad, and MWRD.
The Village completed a Phase I Preliminary Engineering Study in 2022. The study aimed to evaluate several design options and receive conceptual approval from various agencies, including IDOT, Union Pacific Railroad, Mount Prospect Park District, and MWRD. Phase II Design Engineering began in 2024 and was completed at the end of 2025. This phase included the development of engineering drawings and specifications for construction. Construction is expected to begin in Fall 2026 and take approximately one year to complete.
Construction Schedule
- Phase I Preliminary Engineering: completed August 2022
- Phase II Design Engineering: June 2024 through December 2025
- Phase III Construction: August 2026 through Fall 2027
June 23, 2026 – IDOT awards construction contract to Dunnet Bay Construction Company
May 19, 2026 – Village Board approves construction contract to Dunnet Bay Construction Company
May 5, 2026 - Village Board Meeting to discuss awarding a construction contract
April 24, 2026 - Construction bid opening
March 13, 2025 - Village awarded $3,000,000 grant from the Grade Crossing Protection Fund
March 8, 2024 – Congressman Mike Quigley secures $517,400 as part of the Congressional Appropriations bill
November 29, 2023 – Village awarded $2,033,824 grant from the Surface Transportation Program
November 7, 2023 – Village Board awards contract to Ciorba Group, Inc. for engineering consulting services to complete Phase II Engineering
April 13, 2023 – Village awarded $3,000,000 grant from the Illinois Transportation Enhancement Program
August 19, 2022 – Village received Phase I Engineering approval from the Illinois Department of Transportation
June 30, 2021 – Village will launch a pre-recorded virtual presentation on July 14. Public comment period will be from July 14 – August 13.
September 24, 2020 – Village awarded $62,000 from the Invest in Cook Program
February 18, 2020 – Village Board awards contract to Burns & McDonnell for engineering consulting services to complete Phase I Engineering
The Village has secured various federal grants to fund a majority of the project. We have been awarded $3,000,000 from the Illinois Transportation Enhancement Program, $4,222,487 from the Surface Transportation Program, $62,000 from the Invest in Cook Program, $517,400 from Congressman Mike Quigley as part of the 2024 Congressional Appropriations bill, and $3,000,000 from the Grade Crossing Protection Fund. This equals to $10,801,887 in grant funding for all phases of the project.
The Resident Information Bulletin provides timely updates on Melas-Meadows Pedestrian Bridge construction that may affect residents. Bulletins are issued as needed to communicate important information such as construction activities, service changes, public meetings, emergency notifications, seasonal reminders, and other community updates. The goal is to keep residents informed, provide advance notice of upcoming activities, and direct them to additional resources when needed.
July 2026 Bulletins:
Phase I Project Development Report
Public Meetings Timeline: Committee of the Whole Meeting :
11-21-2017 Village Board Meeting: Enact a resolution authorizing and supporting an application for grant funding from the Illinois Transportation Enhancement Program to design and construct the Melas- Meadows Pedestrian Bridge
4-3-2018 Village Board Meeting: Motion to accept the Proposal for the Melas-Meadows Pedestrian Bridge Phase 1 Engineering Services in and amount not to exceed $124,131.36
2-11-2020 Committee of the Whole Meeting: Melas-Meadows Bridge Project Update and Village Board direction regarding award of Phase 1 Engineering Contract to Burns & McDonnell.
2-18-2020 Village Board Meeting: Motion to accept the Proposal for the Melas-Meadows Pedestrian Bridge Phase 1 Engineering Services in and amount not to exceed $124,131.36 [This matter was initially discussed at the 4/18/2018, Regular Meeting of the Village Board. At that time, no award was approved and staff was directed to solicit financial commitments from referenced stakeholders to participate in funding the proposed work.]
7-21-2020 Village Board Meeting: Approve a resolution authorizing staff to enter into preliminary engineering service agreements with the Union Pacific Railroad for the Development of the Melas-Meadows Bridge Phase 1 Study Project
10-20-2020 Village Board Meeting : Approve a resolution authorizing an Illinois Transportation Enhancement Program (ITEP) grant application to fund a portion of the Melas-Meadows Pedestrian Bridge to fund design and construction costs.
7-21-2021 Committee of the Whole Meeting: Melas-Meadows Bridge Project Informational Update
9-6-2022 Village Board Meeting: Approve a resolution authorizing an Illinois Transportation Enhancement Program (ITEP) grant application to fund a portion of the Melas-Meadows Pedestrian Bridge to fund design and construction costs.
11-7-2023 Village Board Meeting: Motion to accept the proposal for Melas-Meadows Pedestrian Bridge Phase II Engineering for an amount not to exceed $725,716.
1-14-2025 Committee of the Whole Meeting: Preferred Alternative for Melas-Meadows Pedestrian Bridge Main Span
7-15-2025 Village Board Meeting: Approve a resolution authorizing the Mayor to sign an Intergovernmental Agreement with the Mt. Prospect Park District for construction of the bridge.
9-16-2025 Village Board Meeting: Motion to accept the proposal from Ciorba Group to provide Phase III Construction Engineering services for the Melas/Meadows Pedestrian Bridge Project for an amount not to exceed $856,458.
5-19-2026 Village Board Meeting: Motion to approve construction contract to Dunnet Bay Construction Company for the Melas/Meadows Pedestrian Bridge Project for an amount of $10,744,242.85, the Village portion not to exceed $1,441,385.85.
FAQs
In the early 2010s, Village staff received guidance from the Village Board to develop projects that could help mitigate the isolating effects of the several multi-lane, high-volume, arterial roads that dissect the Village.
The Melas/Meadows bridge is one of these projects. When constructed, the bridge will provide a means for pedestrians and bicyclists to cross both the Union Pacific Railroad tracks and Northwest Highway. Presently, there is no way to safely cross these corridors between the Central Road intersections and the grade crossing near the intersection of Arthur Avenue and Davis Street in Arlington Heights. This is a span of almost 1.4 miles through the middle of Mount Prospect.
Other recent projects designed to improve cross-town mobility for people who are not in cars include the Central Road & Weller Lane pedestrian crossing, the Central Road & Cathy Lane pedestrian crossing, the Central Road & Emerson Street pedestrian crossing, the Busse Road & Lonnquist Boulevard pedestrian crossing, and the Busse Avenue & Main Steet pedestrian crossing.
In addition, this bridge will form a key part of the Village’s bike plan. It will provide a safe means for bicyclists to travel across town from the north to the south and vice versa. Immediately it will provide a new, safe way for students to walk or bike to Prospect High School as many students live south of Central Road. It may even wind up forming a crucial link to the Northwest Municipal Conference’s regional bike path planned for the Northwest Highway corridor.
The bridge is currently estimated to cost $12,450,309 for all phases of the project. Fortunately, the Village has been awarded $10,801,887 in grant funding, which amounts to 87% of all project costs.
The Village’s total cost for the bridge is expected to be $1,648,476. Of this amount, $207,090 has already been spent on Phase I engineering (preliminary engineering), and Phase II engineering (design engineering). The Village is responsible to pay $1,317,210 for construction and $124,176 for construction engineering (a total of $1,441,386).
Not for construction costs. Actual construction is the biggest expenditure. The contract for this project will be issued by the Illinois Department of Transportation (IDOT). IDOT will pay the contractor and bill the Village for the local share later.
However, the Village will let and administer the construction engineering contract. Consequently, the Village will be the first payer for the engineering firm hired to monitor the contractor’s work.
No. The bridge will span a highway right-of-way owned by the State of Illinois and a railroad right-of-way owned by the Union Pacific Railroad (UPRR). The piers and ramps will be built in Meadows Park and in Melas Park. Meadows Park is owned by the Mt. Prospect Park District. Melas Park is owned by the Metropolitan Water Reclamation District of Greater Chicago (MWRDGC).
IDOT and UPRR have approved this bridge. Both agencies have been involved in this project since initiation and have actively participated in Phase I and Phase II engineering. In addition, both agencies approved the Project Development Report and IDOT has agreed to let the contract for this project. UPRR has granted a permanent easement across the railroad tracks to allow for the construction of the bridge.
The Mt. Prospect Park District has executed an intergovernmental agreement supporting the construction and operation of the bridge. In addition, the park district has granted a permanent easement to utilize park district land for the north side ramp, bridge piers, and sidewalks.
The Village has entered into a long-term lease agreement with the MWRDGC to develop and operate Melas Park for public recreational purposes. The Village has, in turn, executed sub-leases with the Mt. Prospect Park District and the Arlington Heights Park District to develop athletic and recreational facilities at the park. Like IDOT and UPRR, the MWRDGC has been involved in project development since initiation and supports the effort. In addition, the construction of a bridge connecting shared use paths at the two parks is consistent with the overall objective of the lease agreement between MWRDGC and the Village.
The bridge is slated to be let for public bidding in April 2026. IDOT and the Village will likely award a contract in May 2026. Construction should start in summer 2026 and be substantially complete by the summer 2027. Final completion is expected in fall 2027 when landscaping and other items not affecting the operation of the bridge will be completed.
The bridge will be a prefabricated truss main span with staircases and access ramps. The best representation of the type, size, and location of the bridge are computer-generated renderings of the bridge available on the project homepage. Just search for melas-meadows pedestrian bridge in your browser of choice.
The bridge deck, approach ramp, and piers will be made of concrete. The main span support piers will feature form-lined concrete to simulate fieldstone.
The fence, posts, railings, and steel truss will be painted black.
Yes, the landscaping depicted in the renderings will be installed as part of the construction project. The cost of landscape materials is included in the current cost estimate.
The main bridge deck will be 23’6” above the railroad tracks and 30’2” above Northwest Highway. For reference, the Village’s black streetlight poles on Northwest Highway near the proposed bridge site are 40’ tall.
The north ramp is 689’ long as measured from the Meadows Park parking lot to the deck pier. The south ramp is 613’ long as measured from the existing path to the deck pier. The approach ramps are 10’ wide and will be made of concrete.
The bridge and the approach ramps must be compliant with current accessibility requirements (such as the Americans with Disabilities Act (ADA)). Notably, these rules limit the running slope to less than a 5% incline (1:20) and the cross slope to less than 2% (1:48). These slope requirements ensure that the ramps, and the bridge, are accessible to individuals using wheelchairs, walkers, or other mobility devices. To make the ramps compliant with these regulations, a very gradual slope was used which increased the length of the ramps.
The bridge approaches will have a variable 4’6” - 6' high fence and the main span will have a 9’ high fence.
Both the main span fencing and the ramp fencing will have 2” openings and 9-gauge wire.
The specified fencing is compliant with both IDOT and UPRR requirements for bridge construction.
Yes. The main span, ramps, and staircases will be lit. The lighting will be provided by a combination of overhead streetlight-style light posts, rail-mounted luminaires on the main span, and Cree Edge transportation series luminaires installed where the access ramps double back on themselves. All luminaires will operate at 3,000 Kelvin color temperature (a soft white). Pole-mounted overhead luminaires will include glare reducing shields.
Target lighting levels for this project were obtained from the IES (Illuminating Engineering Society) RP-43-22 standard. Design criteria were established for 3 distinct areas including a mixed-use path, pedestrian overpass, and stairs. The targeted lighting zone is Zone 2 (LZ-2).
LZ2 represents a moderate ambient lighting environment, typical for areas with human activity where vision adapts to moderate light levels. It's often associated with residential neighborhoods, public parks, and commercial zones needing consistent illumination for safety and visibility.
IES and Dark Sky Association outdoor lighting standards range from LZ0 to LZ4. LZ0 applies to rural spaces and LZ4 applies to brightly lit spaces like city centers.
The bridge will be owned, operated, and maintained by the Village of Mount Prospect.
Cameras are not included in the current bridge construction cost. However, a camera system can be added to monitor the main span and bridge approaches for approximately $35,000. Cameras can be added after the project is completed by Village crews.
The bridge will be insured by the Village. The Village participates in the Illinois Risk Management Association (IRMA) insurance pool. Premiums are determined on a revenue basis. They are not asset-based. Consequently, the addition of pedestrian bridge will not affect insurance rates.
Village staff expects that routine maintenance costs, such as sweeping, snow removal, and landscape maintenance, will be absorbed into the existing operating budget.
The exceptions will be periodic inspections by an IDOT-certified bridge inspector (every 2-4 years), bridge deck joint sealant maintenance (approximately 6 joints every 15-20 years), and steel truss painting (20 years).
The main bridge span and the bridge approach ramps are curbed to prevent water from draining onto the roadway, railway, or lower ramps. The water is collected in drains installed along the curb lines and conveyed via pipe to at-grade discharges.
Yes. Soil borings have been collected and analyzed. There are no identified soil issues. The soil appears structurally adequate to support the approach ramps and the bridge piers.
Yes. Some overhead and underground utilities will need to be relocated to accommodate the bridge and the bridge approaches. The cost of relocating these utilities is included in the current estimate. The work is included in the project scope.
The Mount Prospect Village Board has the final word on whether to build the bridge. However, several other agencies must also approve the plans and specifications before the project is let for bidding. These agencies include the Mt. Prospect Park District, the Union Pacific Railroad, and the Illinois Department of Transportation.
Yes. Construction of the piers and ramps will not require closure. The main span will arrive in multiple pieces and spliced together on site. Setting the main span will require two cranes and closure of tracks and Northwest Highway. This will be coordinated with UPRR and IDOT. Village staff expects that the lifts will occur during off-peak travel hours to minimize impacts on traffic.
The Melas/Meadows bridge has been discussed at public meetings at least 12 times since the project began in 2017. Agenda documents, meeting minutes, and video links for these meetings can be found on the project webpage (www.mountprospect.org (search for melas/meadows)). The links can be found in the dropdown menu for Documents & Public Meetings. (Note: Some members of the community may recall that the bridge was discussed as early 2009. However, the project failed to develop due to a lack of funding).
The project has also been reported multiple times by the Daily Herald and Mount Prospect Journal & Topics newspapers. It has also been featured in Village of Mount Prospect social media communications.
The project webpage has been live since April 2020.
Northwest Compass is a charitable organization that owns a building at 1300 West Northwest Highway. It is immediately west of the Meadows Park frontage on Northwest Highway.
The Melas/Meadows bridge plans propose part of an access ramp, staircase, and walking path on Meadows Park property near the property line between Northwest Compass and the park. In particular, the plans route the walking path through a garden area that features native and pollinator plants. Grading and construction will eliminate most of the garden area.
Northwest Compass reports that they constructed the garden 2 years ago. Some of the garden, including a walking path that connects a patio to the charity’s rear parking lot, is installed in Meadows Park on Mt. Prospect Park District property. However, Northwest Compass does not have an easement, or permission, from the Mt. Prospect Park District to construct or operate the garden. Prior to the start of design work for the bridge, the Mt. Prospect Park District had no knowledge that Northwest Compass was utilizing park district property.
Figure 1 depicts the location of the property line in relation to the garden area. The yellow highlighted line is the east property line of the Northwest Compass property.
The Village of Mount Prospect was granted an easement for the construction of the Melas/Meadows bridge by the Mt. Prospect Park District. This easement includes the garden area where the access ramp, staircase, and walking path are planned. The easement area is depicted in Figure 2.
Figure 2 - Easement area in Meadows Park granted to the Village of Mount Prospect
Northwest Compass would like to continue to operate and utilize the garden. The Village of Mount Prospect remains committed to working with Northwest Compass and the Mt. Prospect Park District to find an amicable solution.
Melas-Meadows Pedestrian Bridge Prefinal Renderings