The Village of Mount Prospect is conducting its annual “Shared Cost Sidewalk Program” for 2010. This program gives residents the opportunity to replace their broken or displaced public sidewalk, and share the cost with the Village. The Village will hire a contractor to complete the work this summer. The work will include removing the old sidewalk, installing new concrete, and backfilling along the edges of the new sidewalk with topsoil where necessary. To help hold down the program cost, the Village requests the residents to install grass seed along the edges as necessary. If the squares to be replaced are adjacent to a driveway in poor condition, the contractor will repair only a portion of the driveway (1’ typical width) if necessary. The cost to the residents is $55.00 for a sidewalk square, which includes repairing the 1’ width of driveway, if applicable.

If you are interested in participating in this program, please complete the application form below. Return it along with your payment of $55.00 per sidewalk square to the Engineering Division. The deadline for submitting applications is April 30, 2010. Checks should be made payable to the Village of Mount Prospect.

Please mark those sidewalk squares to be included in the program with a painted “X” by May 15, 2010. If you have any questions please contact Project Engineer Donna Brown at 847-870-5640.

Download Form Here